Hi there, I want to extend my duration map by deleting some columns and moving them along so i can have a higher IQ on my duration map. I was given a calculation to change the values but it doesnt add up.
For example..
@ 1600bar 1157 duration - 85mm3, to make it up to as close to 90 as possible i was told to do this
1319 (new duration value) x 85mm3 (previous iq value) / 1245 (85mm3 duration value) = 90.0522088353mm3
Now in the map the data already there.. for example 75mm3 is 1049, 80 is 1157.. so doing the same calculation
1157 x 75 / 1049 = 82.7216396568
Which is more than 80 as you can see.
Can anybody help me with this?